Job 2412: Sumner Operations Center
We are wrapping up this City of Sumner facility as the city is getting excited to move into their new digs. Great job all!

Job 2507: Des Moines Creek West Warehouse
We have completed the mass grading and built enormous retaining walls so the warehouse can be constructed. More piping needs to be installed as we wrap the waterline around the building for fire protection. The 33 acres site is a challenge in the wet winter months.

Job 2509: Shea Verterra Amenity Center
Mass grading has been completed, and large retaining walls have been constructed to support the future warehouse. Additional piping remains in progress as the waterline is extended around the building to provide fire protection. The 33-acre site presents ongoing challenges during the wet winter months. Project completion is anticipated around September 2026, weather permitting.

Job 2603: Amazon Warehouse BFI5
We are installing storm piping to collect the roof drain water and treat it so it can be discharged into the local streams in the area. Work is just getting started.

Job 2604: Covington Sawyer Road Improvements
We are going to make an unsafe corner on this roadway much safer by opening up the site lines for traffic to see better. We will build a large retaining wall and plant some shrubs to make it look beautiful.

Job 2606: Issaquah Highlands Sewer Improvements
We are installing some new sanitary sewer facilities so the sewer flows more efficiently in the City of Issaquah. We are also going to re-line over 600 feet of sewer piping to extend the life of this critical infrastructure.

Job 2607 Auburn Ave Theater & Downtown Park–
Utility work includes approximately 600 linear feet (LF) of new sanitary sewer, 500 LF of new water main, 150 LF of underground power installation, and associated grading and excavation.

Job 2609 Neighborhood Sewer Rehabilitation–
Installed 5,370 linear feet (LF) of cured-in-place pipe (CIPP) lining within 6-inch concrete residential collector gravity sewer mains. The project included, but was not limited to, robotic reinstatement of sewer laterals, sanitary sewer bypass pumping, cleaning of existing 6-inch concrete sanitary sewer mains, and closed-circuit television (CCTV) inspection before and after rehabilitation.